Home : Residents : Sidewalks, Flooding

Sidewalks and Flooding

Sidewalks

Bellwood manages the annual Sidewalk Program that is open to residents of homes and apartments, and business owners who want to repair their sidewalk. The estimated cost for replacing each square is $250. The property owner or potential buyer must pay for the full replacement cost of the sidewalk. After measurements are taken, the property owner is billed for the cost of the repair. Payment is due prior to the beginning of the work in order for the job to be added to the annual list. The sidewalk inspection is good for six months; another sidewalk inspection is required afterward. There is no fee for each sidewalk inspection performed. For more information, call the Bellwood Public Works Department at (708) 547-3540.

Business owners and business tenants are required by Village Ordinance 99.016 to remove snow and ice from the sidewalk in front of their building or lot of ground. Most sidewalks are five feet wide, which means the entire width must be cleared.

If the sidewalk is wider than five feet, a five foot clearance must be free of snow and ice. If ice is so hard that removal would cause injury to the pavement, a suitable material must be distributed in the area. Materials such as ashes, sand, sawdust or other like materials are acceptable. As soon as the weather permits, the sidewalk should be thoroughly cleaned and cleared. The removal should take place within three hours of the snowfall during the daytime. Overnight snow and ice should be removed by 10 a.m. the following day.

Flooding

Many Bellwood residents currently live in a flood plain. Flood plains are designated by the Federal Emergency Management Association. Bellwood has no control or input in flood plain designation. The Addison Creek Restoration Commission is an Illinois state agency that has been studying the impact of Addison Creek on seven communities including Bellwood. Engineering studies and solutions are being sought to mitigate flooding in the village and the region that have traditionally been burdened during heavy rainfalls and quick thawing periods. The commission hopes to achieve a decrease in the areas designated as flood plains. The engineering solutions are phased processes that include a comprehensive series of projects in many of the seven communities. For more information, visit www.acrc.illinois.gov or www.fema.gov

Below are a few trouble-shooting guidelines for yards, basements and homes. If you suspect a water main break or another circumstance where the village equipment may be damaged or may be the cause of flooding, contact the Village of Bellwood Public Works Department at (708) 547-3540.

Yard Flooding

Causes Solutions
Drainage has been blocked. Remove blockage (i.e., fence or landscaping)
Yard is flat with minor ponding (< 3 days) Install a drain tile, swale or dry well.
Yard is low with major ponding (> 3 days) Install a yard drain or swale.
Yard is in a floodplain. Regrade yard but maintain a floodplain storage.


Basement Flooding

Causes Solutions
Cracks in the floor and/or walls. Install sump pump and stop or control seepage.
Water flowing in from sump pit. Upsize or add another sump pump.
Power loss. Install a battery backup pump.
Floor drain backup. Clean sewer and install backflow prevention.


Overland Flooding Into House

Causes Solutions
Windows or doors below floodplain elevation. Construct floodwalls/berms or raise house.
Inadequate local drainage around house. Install a yard drain or improve swales.
Drainage is blocked. Remove blockage (i.e., landscaping).


Permits

Building permits are required for all construction activities. The Village may provide a list of qualified providers of technical assistance.

 
Village of Bellwood 3200 Washington Blvd., Bellwood, IL 60104 | Village Hall Hours Mon - Fri: 9:00 AM - 5:00 PM Sat: 9:00 AM - 12 noon Sun: Closed | Contact Us
 
© 2017 Village of Bellwood. All rights reserved. | Site design and development by Americaneagle.com | Site Map | Privacy Policy | Terms & Conditions | RSS